Industry

Construction of a production unit for the luxury industry

Torcy
Design and construction supervision (all trades)
    Customer
    MCGP Group
    Partner(s)
    Actierra
    AVLS
    Place
    Torcy (71), France
    Area
    7,000 m²

    Type of services

    Design and construction supervision (all trades)

    Founded in 2004, MCGP has grown around traditional jewellery craftsmanship. As part of its expansion, the group called on Ingerop for the full design and construction supervision (all trades) of a new 7,000 m² production facility that will include several workshops: assembly, finishing, machining, maintenance, quality control and logistics.

    The client’s environmental requirements are also high: rainwater harvesting, industrial water recycling, use of renewable energies (geothermal and photovoltaic), green roofing, and the creation of green spaces including a permaculture vegetable garden. The goal is to achieve at least LEED Gold certification, with a target of Platinum level.

    WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

    • Cyril Crespeau
    Energy
    Nuclear

    Pastel project

    Tricastin
    Analysis and sizing
      Customer
      Orano
      Chemistry and Enrichment
      Place
      Saint-Paul-Trois-Châteaux, Pierrelatte, Tricastin (26),
      Bollène (84), France

      Notre Mission

      At its 650-hectare Tricastin site, one of the largest in Europe, the Orano group wants to renew its facilities for treating uranium effluent from the site’s activities. The Ingerop teams, thanks to their expertise in nuclear processes, have researched and proposed several innovative equipment solutions:

      • analysis of various evaporation technologies and their compatibility with uranium-containing effluents to select the industrial evaporator that will reduce the annual treatment volume by a factor of five,
      • sizing, energy efficiency optimisation and safety assessment for filter press filtration technologies. The main challenge is automating the system and improving radiation protection for the operators.

      WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

      • CEA DAM
      Energy
      Nuclear

      ACIT 3

      France
      Assistance in the design of technical installations
        Customer
        CEA DAM
        (Directorate of Military Applications)
        Partner(s)
        Tractebel
        Assystem
        Place
        France

        Type of services

        After successfully completing an first initial four-year mission, CEA DAM has renewed its trust in Ingerop with a new framework contract, in partnership with Tractebel and Assystem. The mission remains unchanged: to carry out design studies, renovation and creation of new complex and unique facilities (storage, manufacturing, maintenance) as well as scientific ones (data centers, research & development units, etc.).

        The Ingerop teams will be specifically responsible for project management, industrial architecture, coordination and BIM, civil engineering, roadworks and utilities (VRD), geotechnics and handling mechanics.

        Organised into dedicated workspaces near the CEA in Bruyères-le-Châtel, they will be best positioned to meet the client’s requests.

        WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

        • Photo Alta
        Water
        Dikes, dams & hydraulic structures

        Rophémel dam

        Guenroc - Plouasne
        Rehabilitation
          Customer
          Community Water
          of the Rennes Basin
          Place
          Guenroc and Plouasne (22), France

          Types of services

          The hazard study carried out in 2020 by Ingerop revealed the need to reinforce the upstream waterproofing of the empty reservoir dam. In 2021, the CEBR launched a work schedule that incorporates environmental requirements and drinking water needs. Ingerop is managing the execution of this work, which began in 2024.

          The project is structured around an initial phase of draining the reservoir, followed by dredging of the sediments. Next, the rehabilitation work takes place with the reservoir drained, notably including the installation of a waterproof geomembrane on the upstream face of the dam and the rehabilitation of the hydromechanical equipment.

          The work continues with the refilling of the reservoir and the repair of the civil engineering defects.

          WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

          • Ingerop
          Water
          Flood management

          Runoff studies and stormwater master plans for Montpellier

          Montpellier
          Studies
            Customer
            Montpellier Mediterranean Metropolis
            Place
            Montpellier (34), France

            Type of services

            In order to improve knowledge of the risk of flooding due to rainwater run-off in the Montpellier Mediterranean Metropolis area, the aim of this project is to model flood-prone areas throughout the region.

            It enables flood-prone areas to be characterised, flood hazards to be mapped and development solutions to be proposed. The results will be used to prepare the PLUi*, crisis management and vulnerability reduction. The study covers 860 km of hydrographic network, in both urban and natural environments. The 2D hydrological and hydraulic modelling is carried out by applying rainfall to the natural terrain survey and utilising high-definition LIDAR data (IGN). A detailed sensitivity analysis is conducted on test areas (grids, buildings, and small walls). The results will then be used to support crisis management.

            *plui: intermunicipal local urban planning plan

            WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

            • PCA-Stream
            Buildings

            Extension of the Bobigny judicial court

            Bobigny
            Project management
              Customer
              APIJ (Government agency for the Real Estate of the Justice System)
              Partner(s)
              PCA-Stream
              Place
              Bobigny, France
              Area
              20,000 m²

              Type of services

              The second largest court in France, the Bobigny judicial court is expanding with the construction of a new building, which will be linked to the historic building by several footbridges.

              This triangular extension of more than 20,000 m2 is a major challenge for improving the court’s operations. A vast forecourt bordered by gardens will be laid out on the rest of the plot, creating a link with the city.

              For this project, Ingerop is responsible for the following tasks: for HVAC, plumbing, electricity, lifts, external works, operation and maintenance, pre-synthesis, regulatory thermal calculations, BIM, as well as project management via its subsidiary Cicad.

              Architect: PCA-Stream

              WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

              • Nicolas Trouillard
              Buildings
              Business real estate

              Wood

              Grenoble
              Facade engineering
                Customer
                VINCI Immobilier
                Partner(s)
                EDCM Architectes
                Place
                Grenoble, France
                Area
                454 m²
                Awards
                Business Property Prize and Regional Grand Prize at the Pyramides d'Argent

                Types of services

                Located in the heart of Grenoble’s peninsula, Wood is an innovative project in terms of energy consumption, ecological footprint and thermal comfort. The office building is located on a disused industrial site, allowing 454 m2 of green space to be regenerated. The project adopted a responsible design approach, using wood for the framework, posts
                and beams, walls and cladding on the façades.

                Wood uses renewable energies (geothermal and geocooling) and has been designed to be bioclimatic (natural ventilation, optimisation of natural light, etc.). The project also promotes biodiversity by integrating nesting boxes into the thickness of the façades. Wood won two awards at the Pyramides d’Argent: the Business Property Prize and the Regional Grand Prize. It is certified NF HQE Bâtiment Durable ‘Très Performant’, Ready to Osmoz, BEPOS Effinergie 2017, BiodiverCity, E+/C- (level E3C2) and RT2012 -77%.

                Arcora, a subsidiary of the Ingerop Group, was responsible for the façade engineering.

                Architect: ECDM Architects

                WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

                • Michel Rémon & Associés
                Buildings
                Healthcare

                Résurgence project

                Moulins-Yzeure
                Project management for the design
                  Customer
                  Centre Hospitalier Moulins-Yzeure
                  Partner(s)
                  Michel Rémon & Associés
                  Place
                  Moulins-Yzeure, France
                  Area
                  7,700 m²

                  Types of services

                  The Ingerop Group’s knowledge of the hospital sector and its constraints enables it to propose functional and efficient architectures. That’s why the Moulins-Yzeure hospital centre chose our bid to restructure the facility.

                  The 7,700 m² project comprises:

                  • the construction of a new building to house the emergency department, the SAMU departmental call centre and the SMUR, with a helipad,
                  • the redevelopment of five existing floors, spread over three buildings, to create an outpatient unit, two medical units and a paediatric ward.

                  The entire operation is being carried out on an occupied site, with activities being maintained. The Ingerop teams are more specifically in charge of project management for the design (concrete structure, steel structure, external works, HVAC, electricity, medical fluids and sanitary plumbing).

                  Architect: Michel Remon & Associés

                  WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

                  • Enia Architectes
                  Buildings
                  Transportation hubs

                  Airport main building

                  Mérignac
                  Project management
                    Customer
                    Bordeaux-Mérignac Airport
                    Partner(s)
                    Enia Architectes
                    AVLS
                    Arcora
                    Actierra
                    Place
                    Mérignac, France
                    Area
                    21,000 m²

                    Types of services

                    Bordeaux-Mérignac airport is planned to create a central, flexible infrastructure between the two historic terminals (halls A and B) by 2028. The new entity will enable the airport to aim for the best European standards in terms of passenger experience, with a simplified, intuitive and seamless journey.

                    With a view to modernisation, the project also aims to meet the latest regulatory safety requirements while ensuring that the facilities can be upgraded. This 21,000 m² building represents a major challenge in terms of creating a coherent, high-performance facility that can meet the challenges of decarbonisation. As well as shops and waiting areas, it will house a central screening checkpoint (PIF), a new hold baggage handling and control system (STB) and a series of offices.

                    The project will be carried out on an occupied site, without interrupting airport operations. Economically, the new terminal will also be the most ambitious building in the history of Mérignac.

                    Architect: Enia architects

                    Vous souhaitez participer à de grands projets ?

                    • GECINA
                    Buildings
                    Business real estate

                    Mirabeau Tower

                    Paris
                    Full renovation
                      Customer
                      GECINA
                      Partner(s)
                      ORFEO
                      CRO&CO
                      Place
                      Paris 15th, France
                      Area
                      37,900 m²

                      Types of services

                      Designed by architects Le Maresquier & Heckly in 1972, the Mirabeau Tower, located on the Seine quays in Paris’s 15th arrondissement, is currently undergoing a full renovation initiated by its owner, the GECINA group, in partnership with ORFEO and the architectural firm CRO&CO. With an area of approximately 37,900 m2 sdp (1), it comprises 17 office levels. The project aims to rethink the tower’s interior spaces to meet the needs of today’s and tomorrow’s users, including a complete renewal of all technical equipment. The main challenges being to improve visual comfort, summer comfort, as well as thermal and acoustic performance, this renovation incorporates a strong environmental ambition, including among other things:

                      • the objective of BREEAM and HQE Sustainable Building certifications, as well as the BBCA Renovation and BBC Effinergie labels,
                      • the implementation of a material reuse initiative,
                      • the use of renewable energy through the continuation of the existing geothermal loop.

                      (1) sdp: floor area

                      WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

                      • © Société des Grands Projets - JFS Architectes
                      Transportation
                      Metro

                      Grand Paris Express- Line 15 Ouest

                      Hauts-de-Seine
                      Preliminary and detailed design, design check, project management and construction supervision within a design - Build consortium – Infrastructure, equipment, and systems
                        Customer
                        Société des Grands Projets
                        Partner(s)
                        Vinci Grands Projets
                        Place
                        Hauts-de-Seine

                        Type of services

                        Preliminary and detailed design, design check, project management and construction supervision within a design - Build Consortium – Infrastructure, equipment, and systems

                        The first design–build contract for Line 15 of the Grand Paris Express was awarded in 2023 to the Intencités15 consortium, led by Vinci, with Ingerop playing a major role.

                        The group brings its expertise in transport systems integration, electrification, infrastructure design, and BIM, ensuring effective responses to the needs of the project and the broader challenges of future urban mobility.

                        Ingerop also carries out overall coordination along the entire alignment, which includes 14 km of tunnel, five stations and 16 service structures.

                        YOU WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

                        Water
                        Dikes, dams & hydraulic structures

                        Rebuilding of the Apremont dam

                        Apremont
                        Design and work supervision - Impact assessment - Water law file - Geotechnical and underwater investigations
                          Customer
                          VNF – Voies Navigable de France (French Waterways Company)
                          Amount of work
                          3,8 M€
                          Place
                          Apremont

                          Types of services

                          Design and work supervision. Impact assessment Water law file Geotechnical and underwater investigations

                          The project involved rebuilding the Apremont “needle” dam on the Saône in the Haute-Saône district near Gray.

                          Built in 1860 and then modernized from 1982 to 1984, the Apremont dam constitutes a retaining reservoir to supply a diversion canal (navigable) whose entrance is located about 200m upstream from the dam.

                          This dam consists of a fixed part 55m long (spillway) and a mobile part (needle dam) 51m long with 4 passes of 12m. A hydroelectric plant is located on the right bank.

                          The purpose of the project is to:

                          • to replace the existing “needle” dam with a functional and automated structure (2 main passes of 21m – flap gate solution and “Obermeyer” type hydro-gates solution),
                          • realize the restoration of the spillway, the existing structures of the dam which will remain in place and the protection against scouring,
                          • to build a fish pass of the 10 successive basins type, adjoining the right-hand side,
                          • to build an eel pass and a canoe pass,
                          • the construction of a dual-use footbridge, public and technical, on the dam.

                          WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!