Activité: High-speed rail line
Customer
TEP Partner(s)
Sener, Arcadis, TUC RAIL (Engineering consortium with Ingerop)
Place
Perpignan (France) - Figueras (Spain) Types of services
Engineering leader for the whole project.
Project, VISA, North Tunnel entrance, « Air libre France » Civil Works, Supervisory control.
Ventilation calculation - Fumes evacuation in Twin Tube tunnel.
France Outdoor Works:
- 18 km of High-Speed Rail Line.
- 2 flyovers.
- 42 Structures including 4 viaducts: over rivers, A9 Motorway and RN9 Highway.
- Punched Tunnel entrance to minimize « Sonic Boom » effect.
Tunnels:
Twin-Tube tunnel 8,3 km long, 2 x 50 m² finished cross-section with cross-passages every 200 m.