Ingerop Logo Ingerop Logo
  • Bosch
Buildings
Business real estate

Bosch new development centre

Munich - Germany
    Customer
    Bosch Engineering GmbH
    Holzkirchen
    Represented by: Robert Bosch GmbH, Stuttgart
    Partner(s)
    Wma architects wöhr mieslinger associates, Stuttgart, Germany
    Place
    Munich, Germany

    Type of services

    Bosch Engineering and ITK Engineering are working under one roof in Holzkirchen for the first time. Both companies focus on development services for sectors such as automotive, off-highway, railway and medical technology.

    The special feature of the new site is its campus character. A creative working environment will offer around 900 employees space for innovative spirit and flexibility and enable close and transparent dialogue with external partners.

    Specifics

    • Design of the technical systems for use as an office and development site for electromobility, including staff restaurant
    • Implementation of the entire energy technology for heating, cooling and sprinklers for the campus currently under construction at the site

     

    Characteristics of the project

    • Heat recovery from refrigeration and compressed air generation
    • Provision of space reserves for technical facilities for possible further construction phases
    • Project realisation in BIM methodology with all design participants using the REVIT tool
    • BIM-BAP controlling of all parties involved by an external controller

    Vous souhaitez participer à de grands projets ?

    Buildings
    Healthcare

    Saint-Nazaire medical complex

    Saint-Nazaire
    Engineering design (electricity, automatic transportation) & Fire Safety System
      Customer
      GCS Cite Sanitaire Nazairienne
      Partner(s)
      Groupe 6 (Architect)
      Amount of work
      175 M€
      Place
      Saint-Nazaire

      Types of services

      Engineering design (electricity, automatic transportation) Fire Safety System

      The Medical Complex of Saint-Nazaire gathers on this new hospital unit both the functional sectors of a Private Partner called “Mutuelle Atlantique” (private health-care insurance) and the hospital center of Saint-Nazaire (Public Partner).

      This operation corresponds to a Private-Public Partnership. With a conventional hospital capacity of 830 beds, the Medical Complex has a traditional and multidisciplinary hospital activity allowing the regional population to benefit from cutting edge hospital services.

      With an energy production unit of 6.4MW and a logistics center, the project includes the main departments on 4 levels:

      • Emergency department, recovery department, Laboratory, surgery department, Intensive Care Unit of Cardiology, internal and […] multi-disciplinary medicine, Neonatology, Obstetrics, French blood bank.
      • High tech. services:
        • Dialysis
        • Nuclear Radiotherapy
        • Conventional Imaging (MRI, Scanner)
        • Interventional Imaging for Neurology and cardiology
      • Medical consultations department and patient rooms/beds
      • An outdoor car park with 1800 spaces
      • A Residential student building, outside the hospital complex.

      The building is equipped with a heliport made of metal structure.

      Vous souhaitez participer à de grands projets ?

      • S. Demailly
      Buildings
      Healthcare

      Pasteur 2 – New academic hospital

      Nice
      Design Engineering, Fire safety studies, Procurement, & Construction management
        Customer
        Nice General Academic Hospital
        Partner(s)
        Reichen & Robert (Architect)
        Amount of work
        165 M€
        Place
        Nice
        Area
        90 000 m²

        Types of services

        Design Engineering Fire safety studies Procurement Construction management

        The Pasteur 2 new academic hospital gathers on a single site all the disciplines relating to emergency. They are shared between various poles: general emergency medicine and traumatology, neurosciences, cardiovascular, pneumo chest and metabolism.

        These various poles have a capacity of 690 beds; they are served by a medical technical support. The shared resources include 25 operations rooms, 2 MRI, 2 scanners, 10 X-rays imaging rooms, 5 ultrasounds rooms, 6 interventional imaging rooms for neurology and cardiology, 77 beds for intensive cares.

        The technical and functional links with other buildings are made by technical galleries and/or bridges.

        The landscape integration and the respect of beautiful site elements are 2 important qualities of the project.

        Vous souhaitez participer à de grands projets ?

        Buildings
        Business real estate

        Trinity Tower

        Paris - La Defense
        Design, studies and calculations Site supervision
          Customer
          UNIBAIL RODAMCO
          Partner(s)
          Brullmann Crochon (Architect)
          Amount of work
          150 M€
          Place
          Paris- La Defense
          Area
          52 000 m²

          Types of services

          Design, studies and calculations Site supervision

          Structure engineering of special structure (double skin, roof light, top covering ),
          Facade and facade access engineering

          A project by Arcora, an Ingerop subsidiary

          Vous souhaitez participer à de grands projets ?

          Buildings
          Retail, industry & logistics

          CNIT

          Paris - La Defense
          Restructuring of CNIT
            Customer
            UNIBAIL
            Partner(s)
            Brullmann Crochon & Ass (Architect)
            Place
            Paris- La Défense
            Area
            90 000 m²

            Types of services

            Design, studies and calculations Site supervision

            Vous souhaitez participer à de grands projets ?

            Buildings
            Culture, sports & leisure

            Grenoble stadium

            Grenoble
            Engineering all trades
              Customer
              Grenoble Alpes Metropole
              Partner(s)
              A. A. Chaix & Morel (Architects)
              Amount of work
              44 M€
              Place
              Grenoble

              Types of services

              Engineering all trades :
              • FSS (fire safety system)
              • Procurement
              • Construction management

              This stadium has a capacity of 20.000 covered seats, and stands in the inner city (in the middle of a park), as it is replacing the former Charles Berty stadium. This
              stadium is multipurpose-capable: football, rugby as well as events. Supported by a metallic frame, the transparent and round shapes of the roof have been built with wood purlins and glass. It minimizes the visual impact of the building and smoothes its integration in the urban landscape.

              Thanks to an inner technical ring and an outer architectural one, all the functional units are laid under the stands.  Included in the design is the possible extension of 10.000 more covered seats. It will be feasible, with the addition of a balcony. The stadium includes a 1000 places buried parking lot which allows preserving the external planted area.

              Designed per High Environmental Quality standards, the stadium benefits special treatment regarding sound quality and noise protection, and features environmentally selected building products including 1000 m² photovoltaic roof panels. Finally, this project includes specific urban facilities such as service roads and the extension of the C tramway line.

              Vous souhaitez participer à de grands projets ?

              Buildings
              Culture, sports & leisure

              Museum of indigenous arts – Musée du Quai Branly

              Paris
              Overall management of structural works
                Customer
                Etablissement public du Musée du Quai Branly (EPMQB)
                Partner(s)
                Jean NOUVEL (Architecte)
                Amount of work
                150 M€
                Place
                Paris
                Area
                85 400 m²

                Types of services

                Overall management of structural works

                The project includes a total floor area of 85,400 m², of which 26,500 m² are in superstructure and 58,900 m² in infrastructure and a car park of 550 places.

                The structure required 34,400 m3 of concrete, 12,200 m² of masonry and 3,200 t of metal framework. The structure of the museum consists of two sloping ceilings and mezzanine floors of about 40 m wide and 250 m long, supported by bi-articulated metal “stilts”. The stability of both blocks of the museum is ensured by the concrete cores placed at the ends and the central metal pears. A 20 cm central expansion joint allows maximum non-throttled movement in case of emergency.

                The roof of the museum, housing the restaurant and the library, consists of a deactivated concrete slab, accessible, of 10.000m² near the Seine and the Eiffel Tower.

                The structure is protected against water ingress from the basement by a perimeter diaphragm wall with a maximum height of 30 m, recessed at its base in the sands of Bracheux and through a plastic clay layer thus forming a waterproof cap. All around, a clay merlon integrated into the landscape as well as the perimeter walls provide protection against a hundred-year flood of the Seine (with a security guard of 30cm).

                Vous souhaitez participer à de grands projets ?

                • © Macary / Ublena architects
                Buildings
                Culture, sports & leisure

                France Stadium Paris Arena

                Saint-Denis
                Construction design for the 9.000 ton steel roof structure
                  Customer
                  Stade de France Consortium
                  Partner(s)
                  Macary, Zublena
                  Regembal, Costantini
                  Place
                  Saint-Denis

                  Types of services

                  Complete design and project management for structural steel work of roof. Coordination of architectural drawings - Participation in overall design and structural concrete drawings

                  A large 80,000 seat Stadium built in Saint-Denis Paris area. A large metallic cablestayed structure weighing 8,500 t. with 65 m. long cantilevers covers a 62,000 m² surface 10,000 m² of which are made of glass.

                  Vous souhaitez participer à de grands projets ?

                  • © Franck Badaire
                  Buildings
                  Culture, sports & leisure

                  La Canopée

                  Paris
                  Design of a long span roofing for the Forum des Halles shopping mall
                    Partner(s)
                    Patrick Berger
                    J. Anziutti Architects
                    Place
                    Paris

                    Types of services

                    Vous souhaitez participer à de grands projets ?

                    • © Valode and Pistre
                    Buildings
                    Culture, sports & leisure

                    Lille Grand Stadium

                    Lille
                    Engineering design and construction design review
                      Customer
                      Communauté urbaine de Lille
                      Partner(s)
                      Valode & Pitre
                      Place
                      Lille - France

                      Type of services

                      Design, studies and calculations

                      The city of Lille launched in 2007 a stadium project which would match the UEFA demands and which could also host various cultural and sports events.

                      Structure engineering of special structure: roofing, sliding roof.

                      Characteristics
                      Flexible performance venue,
                      The full stadium level reaches a height of 31m (101 feet) and has a total capacity of 50,186 seats including 4,965 business seats, 1,842 luxury-box seats, 448 protocol seats and 326 reserved for the journalists,
                      Enveloped by a translucent shell with rounded angles, the stadium has an immense luminous screen that forms its urban façade,
                      A movable roof consisting of two sliding panels enables the open-air stadium to be converted into an immense covered hall in 15 minutes,
                      HQE building with its solar panels and two windmills to ensure electrical supply,
                      Another arena, located under the movable playing field, appears as a prolongation of the stands.

                      Vous souhaitez participer à de grands projets ?

                      • ©RSHP / J. Bugna
                      Buildings
                      Transportation hubs
                      Infrastructure
                      Airports

                      Geneva Airport

                      Geneva – Switzerland
                      Design and supervision
                        Customer
                        International Airport of Geneva
                        Partner(s)
                        Rogers Stirck Harbourand Partners Atelier
                        J. Bugna
                        Place
                        Geneva - Switzerland

                        Types of services

                        Design and supervision

                        The Geneva International Airport has decided to modernize its facilities with a major enlargement of its “East Wing” to improve passenger comfort.

                         

                        This project includes a 500 m long metal building of with high environmental quality with two levels and is coupled with a new “processor” building dedicated to the control of incoming and outgoing passengers.

                         

                        The whole piece consists of an exo metal structure covering a service road and a 20,000 m² public space.

                         

                        The overall energy mix is balanced thanks to the mobilization of geothermal probes, some equipment with low energy consumption and a photovoltaic power generation of about 1,600 MWh / year.

                        In this context, the route of the access road to the terminal from France (customs road) will be amended and this road partially buried.

                        The consortium including Rogers Stirck Harbour et Partners / Atelier J. Bugna / Ingérop Conseil et Ingénierie (in association with consulting engineers from Geneva including T-Ingénierie) were awarded the contract further to an international tender.

                        Vous souhaitez participer à de grands projets ?

                        • Hôpital de Haute-Pierre
                          ©Airdiasol.Rothan
                        Buildings
                        Healthcare

                        Hautepierre hospital of Strasbourg

                        Strasbourg
                        Extension of the original building
                          Customer
                          University hospitals of Strasbourg
                          Partner(s)
                          Groupe 6 (Architect)
                          Amount of work
                          142,7 M€
                          Place
                          Strasbourg
                          Area
                          35 000 m² & 25 000 m²

                          Notre mission

                          Construction design supervision, Fire system coordination, Electricity, Fluids

                          Realization of the extension of the Hospital of Hautepierre in Strasbourg including:

                          • creation of a medico- technical & musculoskeletal support center (40 000 m²)
                          • creation of a regional Cancer Institute (30 000 m²)
                          • creation of a connection via the existing buildings from the southern entry hall of the hospital
                          • external development works

                          The building dedicated to the medico- technical & musculoskeletal support center will include:

                          • Operating rooms: 36 rooms
                          • Sterilization: 4 units
                          • Imaging rooms: 2 MRI / 3 rooms for conventional imaging
                          • Medical consultations
                          • Beds: 208
                          • Conference center

                          The building dedicated to the Regional Cancer Institute will house the following activities:

                          • Radiotherapy: 6 bunkers/ 1 scanner / 1 intervention unit center
                          • Nuclear medicine: 4 gamma cameras / 2 PET scans / 1 PET IRM
                          • Beds: 232

                          Vous souhaitez participer à de grands projets ?