  • Padma Bridge
    MBEC
  • Padma bridge
    MBEC
Infrastructure
Engineering structures

Padma Multipurpose bridge

Bangladesh
Project management consultancy, quality control, contractual advice, design, monitoring and evualuation
    Customer
    Bangladesh Bridge Authority (BBa) Ministry of Communication
    Partner(s)
    BCL Associates Ltd Padeco Co. Ltd Katahira & Engineers International Te Slaa Consultancy Michael Pickering
    Place
    Bangladesh

    Type of services

    Management support consultantancy (MSC) services Project management Quality control Contractual advice Design Monitoring and evaluation

    Rendel, Ingerop’s UK subsidiary, provided Management Support Consultancy services, which included value engineering design to accelerate construction, on the US $2.9 billion Padma Multipurpose Bridge Project (PMBP).

    Funded by the Government of Bangladesh, PMBP is a two-level, steel truss bridge with a four-lane highway on the upper level and provisions for a single-track railway on the lower level. The upper and lower levels act compositely with a reinforced concrete deck slab. The bridge has a total length of 6.15 kilometres and a width of 22 metres at upper deck level. As well as rail and road, the bridge carries utilities including a high pressure gas pipe and telecommunication lines. The project is considered one of the most challenging construction projects in the country’s history, as in response to very challenging foundation conditions, it features driven piles over 125m long.

    It is the largest bridge in the Ganges-Brahmaputra-Meghna river basin, located approximately 40 kilometres southwest of Dhaka. It connects the south-western region to the rest of Bangladesh to encourage and facilitate economic growth through the transport of people, goods, natural gas and telecommunications.

    In addition to the construction of the bridge itself, there is an elaborate system of associated road constructions including two toll plazas and bridge end facilities, a 13.6 kilometre, four-lane, dual carriageway approach road, culverts, small bridges, underpasses, service roads and service areas for residential accommodation. Complex riverbank protection/training works of 14 kilometres in length were also constructed. The social and environment impacts were carefully managed via the implementation of a Resettlement Action Plan (RAP).

    Rendel provided Management Support Consultancy (MSC) which included project management of the entire scheme including contractual and commercial advice; engineering and technical support and advice; budgetary and financial management; quality control and assurance; advising on dispute settlement; and the implementation of the social safeguard plans (environment, resettlement, etc.).

    Rendel also managed several specific supplementary engineering studies. These included re-detailing of the main bridge precast roadway deck slabs to improve the buildability and enhance longevity; and the design and implementation of a dehumidification system through the interior of the 6.15 kilometres truss main bridge in association with Ingerop, who modelled the completed assembled truss module using 3-D CFD.

    Rendel also completed the original Padma River Crossing Pre-feasibility Study in 2000.

     