Ingerop Logo Ingerop Logo
  • Architekturburo Bermuller Niemeyer Nurnberg
Urban development
Multimodal hubs

Requalification of the multimodal node in Plaerrer

Nuremberg
Urban project management
    Customer
    City of Nuremberg
    Place
    Nuremberg, Deustchland

    Type of services

    Urban project management

    In charge of leading the transformation project of the Plaerrer, a strategic multimodal hub in Nuremberg, Ingerop Deutschland is managing the urban project team to design a more functional and attractive public space. The project involves a complete reorganisation of the infrastructure: redistribution of roadways, reconfiguration of tram and bus lines, improved connections with the metro, and renovation of access
    points. It also includes making the site accessible, creating dedicated spaces for pedestrians and cyclists, new urban amenities and new green spaces.

    The goal is to optimise mobility, enhance accessibility, and improve quality of life, while ensuring the maintenance of existing functions throughout the construction work. This project is part of the master plan ‘Plaerrer becomes green’, ensuring a balanced approach between technical, aesthetic, and environmental requirements.

    YOU WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

    • Métro de mexico, line 1
      Shutterstock
    Transportation
    Metro

    Supervision for the acquisition of ten metro trains

    Saint-Domingue, Dominican Republic
    Design, manufacture, testing and commissioning of rolling stock
      Customer
      Oficina para reordenamiento del transporte (OPRET)
      Place
      Santo Domingo, Dominican Republic

      Type of services

      Design, manufacture, testing and commissioning of rolling stock

      The project aims to increase the transport capacity of Saint-Domingue’s metro line 1 by adding ten trains and three Alstom Metropolis model 9000 vehicles. This involves overseeing the manufacturing and delivery of rolling stock units according to the planned schedule. Ingerop’s mission is to oversee the design, manufacture, testing and commissioning of rolling stock.

      Ingerop ensures the reliability of the trains and compliance with specifications, notably by making sure that every delivered unit has passed the required tests: each unit must leave the factory having successfully completed the scheduled inspections. The inspection will then focus on preventive and operational reliability.

      WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

      • Stéphane Brabant Afrikafu
      Infrastructure
      Roads

      Development of the route des pêches phase 2

      Cotonou, Benin
      Project management, approval of design studies and supervision of works
        Customer
        Société des Infrastructures Routières et de l’Aménagement du Territoire (SIRAT)
        (Road Infrastructure and Land Use Planning Company)
        Place
        Cotonou, Benin

        Type of services

        Project management, approval of design studies and supervision of works

        Ingerop, together with a local partner, serves as the project manager responsible for design check and supervising the construction work. The project involves developing and paving a 43.8 km stretch of the Route des Pêches, including access ramps.

        This route has strong economic and tourist potential, serving in particular the palaces of Abomey, important regions for voodoo culture and the memorial areas of the former slave trading posts. The works include the construction of asphalt carriageways, six engineering structures (four composite bridges and two reinforced concrete girder bridges) and retaining walls. Interventions also include landscaping and the implementation of environmental and social measures.

        Additionally, Ingerop is conducting studies for the implementation of a toll system to secure funding for infrastructure maintenance.

        WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

        • Grimshaw
        Infrastructure

        High Speed 2 (HS2) Contract Lot C1

        London – Birmingham – United Kingdom
        Preliminary design and execution studies
          Customer
          ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick & Sir Robert McAlpine)
          Place
          London to Birmingham,
          United Kingdom

          Types of services

          Preliminary design and execution studies

          HS2 Phase 1 is a new high-speed line covering 225 km from London to Birmingham, UK. The HS2 Phase 1 Lot C1 Contract was awarded to ALIGN JV. This section consists of 21.6 km of high-speed rail line and
          includes a viaduct, a twin-bore tunnel, earthworks, two road bridges, a footbridge and a wildlife crossing structure.

          The Colne Valley viaduct is an iconic structure, 3.4 km long with approach embankments, stretching from the Northolt tunnel at the southern edge of the Colne Valley Regional Park up to the Chilterns at the northern end. It is set in a diverse and ever-changing landscape, made up of intertwined with forests and crosses major obstacles such as roads and a canal.

          The Chilterns tunnel comprises two 16 km-long bored tubes beneath an area of outstanding natural beauty. There are five intervention shafts along the route, four of which are also ventilation shafts. Rendel and Ingerop contributed to the studies in the tender, project and execution phases and assisted the ALIGN JV design-build consortium made up lakes of intertwined during the construction work.

          WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

          • K+S
          Industry
          Chemicals, oil & gas

          Project Werra 2060

          Heringen
          Project management assistance
            Customer
            K+S
            Place
            Heringen, Deutschland

            Type of services

            Project management assistance

            The Werra 2060 project is an ambitious initiative aimed at restructuring the K+S plant to extend its operation until 2060 and secure the supply of potash in Europe, a key element in fertiliser production and various industrial processes.

            This operation is based on a substantial transformation of the plant to modernise its processes while integrating environmental protection practices and sustainable management. This includes considering the use of advanced technologies to reduce our CO2 emissions, improved water resource management, as well as strategies aimed at minimising waste and increasing the sustainability of our processes.

            The Ingerop Deutschland teams support this initiative by providing assistance to the Owner.

            WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

            • Bosch
            Buildings
            Business real estate

            Bosch new development centre

            Munich - Germany
              Customer
              Bosch Engineering GmbH
              Holzkirchen
              Represented by: Robert Bosch GmbH, Stuttgart
              Partner(s)
              Wma architects wöhr mieslinger associates, Stuttgart, Germany
              Place
              Munich, Germany

              Type of services

              Bosch Engineering and ITK Engineering are working under one roof in Holzkirchen for the first time. Both companies focus on development services for sectors such as automotive, off-highway, railway and medical technology.

              The special feature of the new site is its campus character. A creative working environment will offer around 900 employees space for innovative spirit and flexibility and enable close and transparent dialogue with external partners.

              Specifics

              • Design of the technical systems for use as an office and development site for electromobility, including staff restaurant
              • Implementation of the entire energy technology for heating, cooling and sprinklers for the campus currently under construction at the site

               

              Characteristics of the project

              • Heat recovery from refrigeration and compressed air generation
              • Provision of space reserves for technical facilities for possible further construction phases
              • Project realisation in BIM methodology with all design participants using the REVIT tool
              • BIM-BAP controlling of all parties involved by an external controller

              WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

              Energy
              Hydrogen & decarbonisation

              Electrification of the Carabanchel depot

              Madrid - Spain
              Design of a new recharging depot for electric buses
                Customer
                EMT Madrid (Madrid Municipal Transport Company)
                Place
                Madrid, Spain

                Type of services

                EMT Madrid wanted to equip its depot with electric charging stations to strengthen the infrastructure needed for operating zero-emission vehicles. Our subsidiary Evectra was selected for its expertise in electrical engineering for the final three phases of the project:

                • phase 2 – Electrification of 52 buses with 7.5 MVA electrical connection. Installation of two underground transformer centres (5,000 kVA each), a lowvoltage busbar system, and a 333 kWp photovoltaic power plant,
                • phase 3 – electrification of 118 buses with the installation of two new transformer centers, an upgraded low-voltage system, and a 696 kWp photovoltaic power plant,
                • phase 4 – extension for 60 buses including adaptation of the medium-voltage ring, a new transformer centre, reinforcement of the low-voltage system, and a photovoltaic power plant 333.

                This project embodies a commitment to developing integrated solutions that facilitate the energy transition and contribute to sustainable, innovative transport.

                WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

                • Ingerop
                Energy
                Hydrogen & decarbonisation

                Refhyne project 2

                Wesseling - Deutschland
                Project management
                  Customer
                  Linde
                  Place
                  Wesseling, Deutschland

                  Types of services

                  Refhyne 2 is a European initiative aimed at demonstrating the industrial feasibility of large-scale green hydrogen production, particularly for the mobility and industrial sectors.

                  This project focuses on producing hydrogen through water electrolysis powered by solar and wind energy, integrating it into the Shell refinery located in Wesseling, a suburb of Cologne, Deutschland.

                  Ingerop Deutschland is responsible for the design of buildings, infrastructure, and utilities for this European green hydrogen production demonstrator with a capacity of 100 MW.

                  WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

                  • Congo terminal
                  Water
                  Commercial and industrial harbours

                  Extension of Congo terminal on the East pier

                  Democratic Republic of Congo
                    Customer
                    Congo Terminal (AGL)
                    Place
                    Pointe-Noire, Congo

                    Notre Mission

                    Congo Terminal aims to enhance its capacity by adding two new quay berths and expanding its storage area through the construction of a new container terminal on the East Mole of Pointe-Noire port. The project plans to accommodate 400-metre-long container ships, requiring the adaptation of existing and future infrastructure to handle these large vessels.

                    The project includes both the design and construction of a new 750-metre quay, as well as the necessary dredging to accommodate large-capacity container ships. It also includes conducting a navigability study and a wave agitation study, as well as the essential embankments for the northern extension of the east mole.

                    WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

                    • Ingerop
                    Water
                    Dikes, dams & hydraulic structures

                    Lower oMkhomazi water supply

                    Durban - South Africa
                    Design, tendering, construction supervision and commissioning
                      Customer
                      uMngeni-uThukela Water
                      Place
                      Durban, South Africa

                      Notre Mission

                      Faced with the insufficient water resources on the south coast of KwaZulu-Natal, the Lower uMkhomazi water supply project aims to meet the growing demand. This large-scale project involves the construction of a water treatment plant with a capacity of 134 ML/day, incorporating a comprehensive recycling system.

                      Potable water will be transported through a 1400 mm gravity pipeline over a distance of 3 km, leading to a 35 ML storage reservoir. Ingerop in South Africa is managing the entire project: design, tendering, construction supervision and commissioning.

                      WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

                      • Ingerop
                      Water
                      Flood management

                      Burgau flood retention basin

                      Burgau - Germany
                      Design studies
                        Customer
                        Water utility of Donauwörth
                        Place
                        Burgau, Germany

                        Type of services

                        The State of Bavaria, via the Donauwörth water management service, is building a flood retention basin on the Mindel to protect the town of Burgau. This largescale project includes a retention capacity of 1.4 million m³. The basin is based on a slightly curved dam dike, 1.5 km long and 6 m high, as well as on four dam structures with several fields to regulate the retention area. The objective is to reduce the flow from 135 m3/s to 65 m3/s.

                        The project also takes into account the constraints related to the adjacent railway line and the federal highway, which require careful management of the interfaces.

                        WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!

                        • Ingerop
                        Water
                        Commercial and industrial harbours

                        Garacad Seaport

                        Garacad - Somalia
                        Detailed design and site supervision
                          Customer
                          Wadaagsan Company LLC
                          Place
                          Garacad, Somalia

                          Types of services

                          Design review, technical support, construction supervision

                          The port of Garacad is a new container terminal under construction in the city of Garacad, Somalia. This new port has been planned to open up the Horn of Africa, central Somalia, and southeastern Ethiopia to more accessible trade routes with the rest of the world, especially the Arabian Gulf and Asia.

                          Ingerop and its international subsidiaries were involved in the detailed design of the container terminal and in overseeing the site supervision. The scope of the study also included conducting an audit for a port operator to validate quay usage, wave effects and the estimation of CAPEX/OPEX for different options.

                          WANT TO TAKE PART IN MAJOR PROJECTS? JOIN US!