Tramway of Grenoble – E Line
Arch. Gautier Conquet
Client
Syndicat Mixte des Transports en Commun de l'Agglomération Grenobloise (SMTC)
Partenaire(s)
Arch. Gautier Conquet
Mission
General contractor – rail renovation – Maintenance of tracks
Lieu
Grenoble (38)Creation of the E line of tramway of Grenoble. This new 11.5 km long line will serve 18 stations.
Numerous operations will be carried out for the connection to the existing network of the A / B and C lines, as well as the extension of the Prote de France Bridge over the Isère and the reconstruction of the hydraulic structure on the Vence.
Technical innovations: vignole rail, thin rails, draining trench, watering by pumping and water saver.