Renovation of the Viaur Bridge

Client

RFF / SYSTRA

Montant des travaux

14,2 M€

Mission

General contractor – Asbestos disposal and paintwork

Lieu

Viaur (12)

The Viaur Bridge is one of the three major structures of the late 19th century metal constructions with the Eiffel Tower and the Garabit Viaduct.

Designed by Paul BODIN, engineer of the Batignolles Construction Company, it was completed in 1902 after seven years of works.

It allows trains on the Toulouse-Rodez line to cross the valley of Viaur with a length of 412 meters at an altitude of 116 meters above the river. The structure consists of two spans forming an arch of 220 meters, connected to the rear abutments by two spans.

Renovation of the Viaur Bridge
Renovation of the Viaur Bridge
Renovation of the Viaur Bridge
Renovation of the Viaur Bridge
Renovation of the Viaur Bridge