Renault - Production line

Client

CASTEL ET FROMAGET

Mission

EXE study
Metal structures

Lieu

Tangier (Morocco)

Execution study of the steel structure of the building TC Process of the factory Automobile Renault in TANGIER in MOROCCO.

Self-supporting structure in closed metal structure covering an area of approximately 18 000 m2 with an external awning.

Weight: 1,450 tones

One-level building with double truss structure.

The free height under truss is 7.50 meters.

The metal posts are uniformly distributed in a 13mx21m grid.

Renault - Production line
Renault - Production line