Renaturation of the Seymaz

Client

State of Geneva- Renaturation service of water flows

Mission

Pre-project study, final project, tender documentation, project execution and direction of works.

Lieu

Switzerland

Renaturation of the bed and the banks of the Seymaz in an urban environment. Interventions include the construction of a fishway structure, the removal of cannonballs and the concrete that makes the river bed, widening of the major bed and the modification of the Seymaz meandering route.

Renaturation of the Seymaz