Reconstruction of Paris Bridge in Beauvais

Arch. Cabinet ARVAL

Client

City of Beauvais

Partenaire(s)

Arch. Cabinet ARVAL

Mission

General contractor within the framework of conception – construction contract

Lieu

Beauvais (60)

The city of Beauvais has launched a Design-Realization competition to replace the Paris Bridge closed to traffic since 2010.

The SOGEA-PONCIN-ARVAL-Ingerop Group was selected to carry out the reconstruction work in October 2012.

The work includes the demolition of the existing deck while maintaining the supports in their geometric configuration.

Paris Bridge in Beauvais