Photovoltaic facility

Client

EDF Énergies nouvelles

Mission

Project management of design and realization
OPC including the development of the entire site and the demolition lots

Lieu

Toul-Rosières (54)

Construction of a ground-based photovoltaic power plant comprising 12 units with a total capacity of 115 MW in the disused aerial base at Toul-Rosières (350 ha). The relevant plan chosen for the project involves construction of a private high-voltage substation by each producer, in vicinity of transmission network to be connected by RTE.