Institute Bergonié

EIFFAGE CONSTRUCTION NORD AQUITAINE (Entreprise Mandataire), CHABANNE + Partenaires (Architecte de Conception), NIVEAU 3 (Architecte d’Exécution)

Client

Institut Bergonié

Partenaire(s)

EIFFAGE CONSTRUCTION NORD AQUITAINE (Entreprise Mandataire), CHABANNE + Partenaires (Architecte de Conception), NIVEAU 3 (Architecte d’Exécution)

Montant des travaux

19 290 K€

Mission

General contractor : CFO GE CFA and GTB, CVC and smoke extraction, plumbing, medical fluids, automatized transport, biomedical equipment, benches and hoods, lifting devices, VRD
ICPE
Maintenance and total cost
Building equipment interface

Lieu

Bordeaux (33)

Regional Center for the Fight Against Cancer, the Institut Bergonié, decided to build the New Surgical Center on an abandoned site along the course of  Argonne. It is a continuation of the consultation building (NBC) carried out in 2005.

Built in R + 5 under ground, it is connected with the existing radiotherapy underground building and with a gallery on the level that also allows connection with the "Direction / administration" building.

The surgical center includes a 9-room operating theater, a post-intervention surveillance service (SSPI), a continuing care unit (USC), an ambulatory unit (UCA), 45 hospital rooms, 5 consultation posts, radiotherapy service (underground) and the lobby of the institute with the admission posts.

Within the Design / realization Group, INGEROP is responsible for all the technical and biomedical batches.

Total area: 8.657 m²

 

Studies: 2016
Works: 2017-2018

Institute Bergonié
Institute Bergonié
Institute Bergonié
Institute Bergonié