HS2 - Category III Check of Scheme Design for C2 and C3

Jacobs UK Ltd

Client

Arcadis Consulting (UK) Ltd

Partenaire(s)

Jacobs UK Ltd

Montant des travaux

£965 million

Mission

Cat 3 check of Scheme Design

Années

2019-2020

Lieu

- UK

Project overview: This project concerns the Category III check of the Scheme Design for Main Works Contracts C2 and C3 of HS2 Phase 1, which is a high-speed rail link between London Euston and Birmingham. Contract C2 consists of the section between North Portal of Chiltern Tunnels and Brackley. Contract C3 consists of the section from Brackley to Long Itchington Wood Green Tunnel South Portal.