Container Terminal - Port of Lomé

Client

SE2M (owner), Soletanche / EMCC

Mission

Contrôle externe des études d’exécution
Maritim civil works, foundation construction, geotechnical investigation

Lieu

Lomé

The project involves the construction of the 3rd container terminal in the Port of Lomé on behalf of the SE2M company.

Ingerop is in charge of the external control of the construction studies executed by the consortium composed of SOLETANCHE / SOGEA SATOM / EMCC:

  • In-depth audit of the calculation notes,
  • Performance of comparative calculations,
  • Confirmation of geotechnical assumptions (by GEAOS, INGEROP’s subsidiary),
  • Control of the arrangement and reinforcement designs. 

 

Characteristics:

  • Deepwater quay (dredging -15ZP) allowing an occupational space for post-panamax containerships
  • Quay lenght : 450ml
  • Mixte wall structure composed of sheet piling and piles, with a back wall structure supporting the pillar span.

 

Years: 2012

Container Terminal - Port of Lomé