Construction of wood-gas heating plant of Akenes

Arch. Schweitzer et Associés

Client

Urban Community of Bordeaux

Partenaire(s)

Arch. Schweitzer et Associés

Montant des travaux

5,5 M€

Mission

Representatives in design process and fuels

Lieu

Lormont (33)

CUB has decided to build a heating plant of 16 MW capacity, expandable to 32 MW, which will be integrated with the heating network "Les Hauts de Garonne".

The aim is to produce renewable energy as gas energy substitution and secure energy on the network.

The installation comprises a wood boiler of 6 MW and a 10 MW gas boiler.

The project has a strong aim of architectural integration and high performance equipment (securing the fuel supply).

It is fits well the development of eco- area.

Its implementation and design allow a power extension of 32 MW without major modification to the first tranche.

The heating plant was realized within design-realization contract managed by CLIMATEC and atelier Schweitzer Architectes.

GFA: 1000 m².

Wood-gas heating plant of Akenes / ©Schweitzer Architectes
Wood-gas heating plant of Akenes / ©Schweitzer Architectes
Wood-gas heating plant of Akenes / ©Schweitzer Architectes
Wood-gas heating plant of Akenes / ©Schweitzer Architectes
Wood-gas heating plant of Akenes / ©Schweitzer Architectes