Accessibility of Ychoux station

Client

Project Manager: RFF (Aquitaine Poitou-Charente) / Proxy : SYSTRA

Montant des travaux

1,529 M€ (global)

Mission

General contractor. AVP – ACT – OPC -VISA – DET - AOR

Lieu

Ychoux (40)

In order to make the Ychoux railway station accessible, the task includes creation of a pedestrian bridge over railway tracks of Bordeaux / Hendaye line and enhancing accessibility of all the platforms for people with disabilities.

The project includes:

  • construction of a metal walkway with isostatic lattice grate, with a span of 18.50m and 2.50m width, accessible by elevator and staircase,
  • enhancement of the existing platforms to 0.55 m high at the upper level of the rails over a cumulative length of 500 m (2 x 250 m), making the platforms accessible for people with disabilities, together with installation of warning bands, security marking, signs, light signals…

 

Years: 2011-2013